Ñî¹óåú´«Ã½

Port of Everett selects Ñî¹óåú´«Ã½ Construction for Maintenance Dredging work

Port of Everett has selected contractor Ñî¹óåú´«Ã½ to begin maintenance dredging of the Jetty Landing Boat Launch in January 2022.
The $1 million project will remove up to 41,000 cubic yards (cy) – equivalent to about 4,000 dump trucks loads – of river sediment that has settled in the launch basin and is impeding boaters at low tide. The work is expected to last through mid-February.  See Port of Everett News below.