Ñî¹óåú´«Ã½

WP1 Wave Wall and Marker Piles

ProjectWP1 Wave Wall and Marker Piles
DateFebruary 2020
LocationTacoma, WA

Project Summary

The project includes the installation of three HP piles through the existing rip rap and the installation of three channel marker piles.  The wave wall consists of timber tagging between the HP piles with brackets installed to secure the lagging piles.